男人网站在线观看-久久久久久久999-在线观看污污视频-日韩不卡在线-传媒在线观看-www黄色在线观看-国产欧美日韩三级-www.啪啪.com-公与妇乱理三级xxx-黄色一级网站-天天草夜夜操-国产精品麻豆免费版-91豆花在线观看-国产日韩一区-久久精品国产色蜜蜜麻豆-在线观看福利网址-亚洲成年人

從事濟(jì)南彩鋼板房,彩鋼瓦,復(fù)合板,巖棉板,C型鋼,濟(jì)南鋼結(jié)構(gòu)的廠家
服務(wù)電話:13573174182
熱門搜索:濟(jì)南方管,濟(jì)南彩鋼瓦,濟(jì)南巖棉板,濟(jì)南型鋼,濟(jì)南樓承板,濟(jì)南泡沫復(fù)合板
行業(yè)資訊 所在位置- 首頁-新聞中心-行業(yè)資訊

鋼筋桁架樓承板安裝使用要注意什么?

發(fā)布時間:2023-05-20 來源:http://www.ewvvdx.cn/

施工順序
Construction sequence
平面施工順序:每層鋼筋桁架樓承板的鋪設(shè)宜根據(jù)施工圖起始位置向一個方向鋪設(shè),后處理邊角部分。
Plane construction sequence: The laying of each layer of steel truss floor support plate should be carried out in one direction according to the starting position of the construction drawing, and finally, the edges and corners should be treated.
立面施工順序:隨主體結(jié)構(gòu)安裝施工順序鋪設(shè)相應(yīng)各層的鋼筋桁架樓承板。
Facade construction sequence: Lay corresponding steel truss floor support plates for each floor in accordance with the installation and construction sequence of the main structure.
鋼筋桁架樓承板安裝
Installation of steel bar truss floor support plate
適宜在下一節(jié)鋼柱及配套鋼梁安裝完畢后進(jìn)行。
It is suitable to proceed after the installation of the next section of steel columns and supporting steel beams.
樓板鋪設(shè)前
Before laying the floor slab
濟(jì)南樓承板
應(yīng)按圖紙所示的起始位置放設(shè)鋪板時的基準(zhǔn)線。對準(zhǔn)基準(zhǔn)線,安裝塊板, 并依次安裝其它板。樓板連接采用扣合方式,板與板之間的拉鉤連接應(yīng)緊密,保證澆筑混凝土?xí)r不漏漿。
The reference line for laying the board should be placed at the starting position shown on the drawing. Align the reference line, install the first board, and then install the other boards in sequence. The connection of the floor slab adopts a buckle method, and the hook connection between the slabs should be tight to ensure that there is no leakage during the pouring of concrete.
鋼筋桁架樓承板就位之后
After the steel truss floor support plate is in place
應(yīng)將其端部的豎向鋼筋及底模與鋼梁點(diǎn)焊牢固。沿板寬度方向?qū)⒌啄Ec鋼梁點(diǎn)焊,焊接采用手工電弧焊,間距不大于300mm。
The vertical reinforcement and bottom formwork at its end should be firmly spot welded with the steel beam. Spot weld the bottom formwork with the steel beam along the width direction of the plate. Manual arc welding is adopted for welding, and the spacing is not more than 300mm.
樓板鋪設(shè)前
Before laying the floor slab
應(yīng)按圖紙所示的起始位置放設(shè)鋪板時的基準(zhǔn)線。對準(zhǔn)基準(zhǔn)線,安裝塊板, 并依次安裝其它板。樓板連接采用扣合方式,板與板之間的拉鉤連接應(yīng)緊密,保證澆筑混凝土?xí)r不漏漿。
The reference line for laying the board should be placed at the starting position shown on the drawing. Align the reference line, install the first board, and then install the other boards in sequence. The connection of the floor slab adopts a buckle method, and the hook connection between the slabs should be tight to ensure that there is no leakage during the pouring of concrete.
本文由濟(jì)南樓承板提供技術(shù)支持,更多的詳細(xì)精彩內(nèi)容請點(diǎn)擊我們的網(wǎng)站  http://www.ewvvdx.cn ,我們將會全心全意為您提供滿意的服務(wù)。
This article is supported by Jinan Building Support Board. For more detailed and exciting content, please click on our website http://www.ewvvdx.cn We will wholeheartedly provide you with satisfactory service.
株洲市| 汝阳县| 灌云县| 大渡口区| 饶平县| 雷波县| 山东省| 合阳县| 驻马店市| 泽州县| 五指山市| 团风县| 长海县| 余庆县| 康保县| 曲阜市| 介休市| 蕉岭县| 明溪县| 玉树县| 延安市| 修水县| 太白县| 沧源| 安丘市| 博白县| 馆陶县| 驻马店市| 吴川市| 涡阳县| 古交市| 尉犁县| 安庆市| 松滋市| 惠水县| 安阳县| 麻城市| 资源县| 沂源县| 寻甸| 张家口市|